SITUATION
Glover Construction was charged with creating a 26.5-acre lined cell for ash storage, with a 68,000 cubic-yards clay liner.
SOLUTION
The project required clearing, establishing erosion control devices, installing a leachate collection system, and stabilizing on- and off-site disturbed areas.
Prior to shaping the cell to design grade, 80,000 cubic yards of ash was hauled and placed to create the subgrade for the cell. An additional 300,000 cubic yards of select soil was hauled from an off-site source to complete the cell footprint.
OUTCOME
- All work ran concurrently with daily plant operations without creating interruption.
Contract Value: $6.24 million